<< SHP Group
česky
english
по-русски

<< Back to Railway bridges

Centralbron Stockholm, Sweden

Under construction

The railway bridge located in the centre of the city replaces an old structure. The bridge is formed by a trough steel deck of eight continuous spans of lengths from 23.97 to 33.72 m. The deck consists of the edge plate girders mutually connected by floor beams and by an orthotropic plate. Part of the crossing is also a pedestrian bridge formed by a box girder that is supported by cross beams connected with vertical stiffeners.

SHP: alternative design
          detailed design