<< SHP Group
česky
english
по-русски

<< Back to Competitions

Bridge across the River Elbe in Jaromer (2014)

The proposal that used Inverted Fink Truss structural system followed the shape of the original lattice structure. The superstructure with a span of 58.80 m consists of two steel beams composite with the concrete slab that are suspended on stay cables supported by 6.90 m high steel columns.