The bridge, with a total length of 588 m, is formed by a composite girder with large overhangs and its main span, with a length of 185 m, is suspended on low pylons.
The design received third prize.
Strasky, Husty and Partners Ltd. (SHP), Bohunicka 133/50, 619 00 Brno, Czech Republic