<< SHP Group
česky
english
по-русски

<< Back to Competitions

Dvorecky Bridge across the Vltava River, Prague (2018)

The bridge is formed by a self-anchored arch structure, which continuously changes into a continuous girder on its both sides. The span length of the main span is 93.0 m, the span length of approach spans is from 33.35 to 54.00 m. The arch structure is formed by a box girder of a variable depth, which is supported by struts starting from central piers. Girder and struts are formed by a basic steel section which is composite with concrete.