The segmental structure assembled from precast segments and a composite deck slab was verified on model built at the scale 1:4.5. The process of construction corresponded to the construction of the actual bridge. The segments were match cast and were erected in balanced cantilevers.
In collaboration with the Department of Concrete and Masonry Structures, Faculty of Civil Engineering, Brno University of Technology.