Under construction
The heat pipes situated between Temelin Nuclear Power Station and city of Ceske Budejovice are carried across the Municky Creek and wetlands on two suspension structures of the same structural solution. The pipelines are supported by light steel grids, which are suspended on two, outwardly inclined suspension cables and are reinforced by external cables situated at the edges of the grids. The suspension structure has three spans with span lengths of 16.5 + 110.0 + 16.5 m, the pylons are from concrete and have a V-shape.
SHP: design for planning permission
design for construction permission
tender design
designer´s supervision