<< SHP Group
česky
english
по-русски

<< Back to Stress ribbon bridges

DS-L Bridges

Completed in 1979 – 1986

These bridges are formed by a stress ribbon of one, two or three spans, with lengths up to 102 m. The stress ribbon is assembled from precast segments with a depth of 0.30 m, and cast-in-place saddles at intermediate supports.

Design: Design office of Dopravni stavby Olomouc.
Jiri Strasky: Author of design, chief design engineer.
Ilja Husty: Project engineer.

(slides: Bridge across the Svratka River in Brno-Komin, Bridge across the Vltava River in Prague-Troja, Bridge across the Elbe River in Nymburk)