Completed in 2007
The deck of the bridge is formed by a 43.50 m long stress ribbon, supported by a flat arch. Since both the stress ribbon and the arch are fixed in common end abutments, the structure forms a self-anchored system that stresses footings by vertical forces only.
SHP: design for construction permission
bid design
detailed design