<< SHP Group
česky
english
по-русски

<< Back to Arch bridges

Bridge across the Svratka River in Brno

Completed in 2007

The deck of the bridge is formed by a 43.50 m long stress ribbon, supported by a flat arch. Since both the stress ribbon and the arch are fixed in common end abutments, the structure forms a self-anchored system that stresses footings by vertical forces only.

SHP: design for construction permission
          bid design
          detailed design