<< SHP Group
česky
english
по-русски

<< Back to Arch bridges

Bridge across the high-speed road R35 near the city of Olomouc

Completed in 2007

The bridge is formed by a stress ribbon with two spans supported by an arch. The stress ribbon, with a length of 76.50 m, is assembled from precast segments 3.00 m long, carried and prestressed by two external tendons.

SHP: design for construction permission
          bid design
          detailed design