Completed in 2007
The bridge is formed by a stress ribbon with two spans supported by an arch. The stress ribbon, with a length of 76.50 m, is assembled from precast segments 3.00 m long, carried and prestressed by two external tendons.
SHP: design for construction permission
bid design
detailed design