Under construction
The twin bridge of the total length of 478.60 m is formed by a continuous girder of eight spans of a span length from 45.00 to 64.50 m. The deck of each bridge is formed by a box girder that is assembled of a steel girder of the trough cross section and a composite cast-in-place concrete slab. The steel girders were incrementally launched; the deck slab was incrementally cast in a formwork suspended on movable scaffolding.
SHP: alternative design
detailed design