<< SHP Group
česky
english
по-русски

<< Back to Steel

Bridge 205, Expressway R1, section Beladice - Tekovské Nemce, Slovakia

Completed in 2011

The twin bridge of the total length of 187.6 m forms a continuous structure of 5 spans of lengths 33.0 + 3 x 40.0 + 33.0 m. The deck is assembled of steel plate girders and a composite deck slab. The girders are indirectly supported cross beams are supported by couples of columns.

SHP: architectural design
          checking of the design
          technical supervision of the construction
          loading test