Bridge on Laranjeiras Canal, Laguna - SC, Brazil

Completed in 2015

The bridge of the total length of 2.800 km is formed by a main cable-stayed bridge of length of 400 m and by approach viaducts of the lengths 1,640 and 790 m. The viaducts’ superstructure is formed by chains of simple spans of span length of 40 and 50 m that are mutually connected by a cast-in-place deck slab. The deck of 24.10 m wide spans is assembled of a spine box girder and additionally cast overhangs supported by precast struts. The box girder is assembled of precast, match cast segments of depth of 3.20 m that are during erection suspended on movable scaffolding.

SHP: quality control