Completed in 2002
The twin bridge, with a total length of 215.5 m and with spans 24.0 + 5 x 31.0 + 24.0 m, is formed using precast girders and a composite deck slab. The continuous structure was created by cast-in-place pier diaphragms and reinforcement of the composite slab.
SHP: design for construction permission
bid design
managing the detailed design