Completed in 2011
The twin bridge, with a total length of 376 m forms a continuous structure of 16 spans of lengths 25.0 + 9 x 36.0 + 25.0 m. The deck of a double-tee cross section was progressively cast – span by span – in a formwork supported by movable scaffolding.
SHP: architectural design
checking of the design
technical supervision of the construction
loading test