Completed in 2014
Two parallel seven span bridges formed by simple spans of lengths from 32 to 92 meters were temporarily connected above supports and subsequently were gradually dismantled. Dismantling was carried out gradually span-by-span; during disassembly the dismantled span was supported by vessels.
SHP: design of the disassembly of the steel structure
static analysis