Completed in 2011
The bridge of the total length of 1 164 m is formed by 357.5 m long main bridge across the River Nitra and the 806.5 m long approach viaduct. The main bridge has 5 spans of length from 50.0 to 85.0 m. The deck of three cell box section was cast segment by segment in symmetrical cantilevers. The viaduct is formed by a twin bridge of one cell box section. The bridge with spans from 28.0 to 45.0 m was incrementally launched.
SHP: architectural design
checking of the design, technical supervision of the construction
loading test