Bridge Marianske Radcice

Completed in 2018

The bridge of the total length of 169 m and spans from 18 to 51 m is formed by two parts: main cable stayed spans crossing the railway tracks and Bilina River, and by continuously linked approach spans from prestressed concrete. The deck of the suspended spans is formed by two steel edge plate girders, floor beams and a composite deck slab, the approaches are formed by concrete edge girders and a deck slab.