<< SHP Group
česky
english
по-русски

<< Back to Repairs

Bridge across Hapalova Street, Brno

Completed in 2004

The original segmental structure, formed by two-box girders mutually connected by a deck slab, was strengthened by additional external cables situated inside the cells.

SHP: design for construction permission
          bid design
          detailed design