<< SHP Group
česky
english
по-русски

<< Back to Railway bridges

Overpass across the freeway D47 near Bohumin

Completed in 2006

The bridge, with four spans of 12.55 + 19.70 + 19.70 + 12.55 m, is formed by a concrete slab reinforced by steel girders.

SHP: conceptual design
          managing the detailed design