Bridge across the Masaryk Railway Station, Prague

Completed in 2008

The bridge, with a total length of 439 m, has 12 spans of lengths from 31.50 to 39.87 m. It is formed by a three-cell box girder that transforms into five-cell girders at the widening near the end abutment. Outer, curved cells are formed by precast members; the top slab was cast in the formwork formed by precast slab members.

SHP: checking the final design