<< SHP Group
česky
english
по-русски

<< Back to Suspension bridges

Lunda Footbridge, Umeå, Sweden

Completed in 2019

The stress ribbon deck of one span of a length of 181 m, is suspended on two suspension cables with spans of 25 + 187 + 25 m. The deck of a streamline cross section is assembled from precast segments of a variable width from 8.21 to 6.30 m and a depth of only 0.34 m.

SHP: alternative design
          detailed design