Completed in 2010
The stress ribbon deck of three spans 54 + 138 + 54 m is suspended on two suspension cables. The stress ribbon is assembled from precast segments of width 6.35 m and a depth of only 0.40 m.
Design: CH2M Hill, Edmonton, Alberta
Jiri Strasky: Specialty consultant, checking the design