<< SHP Group
česky
english
по-русски

<< Back to Suspension bridges

Bridge across the Swiss Bay of Vranov Lake

Completed in 1993

The stress ribbon deck, which has one span with a length of 252 m, is suspended on two cables with spans 30+252+30 m. The stress ribbon is assembled from precast segments of variable width from 10 to 6.5 m and a depth of only 0.42 m.

Design: Design office of Dopravni stavby Olomouc.
Jiri Strasky: Author of design, chief design engineer.