Completed in 2016
The bridge is formed by a stress-ribbon deck of 3 spans of lengths of 77 + 100 + 85 m that is assembled of precast segments and cast-in-place saddles situated at the end abutments and piers.
Design: Stantec, Edmonton, Alberta
Jiri Strasky: Specialty consultant, checking the design.