<< SHP Group
česky
english
по-русски

<< Back to Stress ribbon bridges

Golf Cart Bridges, Rancho Santa Fe, San Diego, California, USA

Completed in 1999

Two identical stress-ribbon bridges have a single span with a length of 86.37 m. The stress ribbon is assembled from precast segments and cast-in-place saddles.

Design: T.Y.Lin International, San Diego, California
Jiri Strasky: Specialty Consultant, checking the final design.