<< SHP Group
česky
english
по-русски

<< Back to Stress ribbon bridges

Bridge across the Sacramento River, Redding, California, USA

Completed in 1990

The bridge of one span, with a length of 127.40 m, is formed by a stress ribbon assembled from precast segments with a depth of 0.38 m.

Design: Charles Redfield, Mill Valley, California.
Jiri Strasky: Conceptual design, detailed static and dynamic analysis.