Completed in 2001
The structure, with two spans of 37.5+49.5 m, is the first stress-ribbon structure with cranked alignment. The stress ribbon is assembled from precast segments and a composite slab with a total depth of 0.29 m. The intermediate pier also serves as stairs.
SHP: conceptual design
bid design - in a collaboration with Cezary Bednarski, London, UK