Completed in 2001
The bridge of one span, whose length is 76.80 m, is formed by a stress ribbon assembled from precast segments and a composite deck slab.
Design: Huitt-Zollars (GNA Inc), Denver, Co & Charles Redfield, Mill Valley, California.
Jiri Strasky: Conceptual design, detailed static and dynamic analysis.