<< SHP Group
česky
english
по-русски

<< Back to Cable-stayed bridges

I-5 Pedestrian Bridge, Eugene, Oregon, USA

Completed in 2009

The structure is formed by a main cable-stayed structure of two spans of 31.76 m that is monolithically connected to ramps. The cable-stayed structure is formed by a slender deck of depth of 0.49 m that is suspended on the central pylon situated in the middle of the freeway.

Design: OBEC Consulting Engineers, Eugene, Oregon.
Jiri Strasky: Conceptual design, detailed static and dynamic analysis.