<< SHP Group
česky
english
по-русски

<< Back to Cable-stayed bridges

Bridge across the freeway D47 near Bohumin

Completed in 2011

The bridge is formed by a spine girder of two spans with lengths of 51.35 and 59.15 m with overhangs that are suspended in the bridge axis on a steel pylon. One overhang serves for pedestrians, the other is for cyclists.

SHP: design for construction permission
          bid design
          detailed design