<< SHP Group
česky
english
по-русски

<< Back to Cable-stayed bridges

Bridge across the Elbe River near Celakovice

Completed in 2014

Pedestrian bridge of the total length of 242 m and main span of 156 m is suspended on two steel pylons of the shape of the letter A. The deck is assmbled of precast match cast segments of double tee cross sections from high strength concrete.

SHP: alternative design
          checking of the design
          construction engineering