Completed in 2006
The bridge consists of a stress-ribbon concrete deck suspended on two inclined arches with a span of 73.50 m. The arches are formed by steel pipes.
Design: OBEC Consulting Engineers, Eugene, Oregon.
Jiri Strasky: Conceptual design, detailed static and dynamic analysis.