Completed in 2006
The bridge is formed by a one-sided inclined arch with a span of 53.20 m, which is tied by a composite deck slab. The bridge is integral with the end abutments.
SHP: design for construction permission
bid design
detailed design
Strasky, Husty and Partners Ltd. (SHP), Bohunicka 133/50, 619 00 Brno, Czech Republic