Completed in 2013
The bridge is formed by a spine girder that is suspended on a central arch of a span of 58.53 m. The arch force is resisted by a prestressed concrete deck that is integrated with the end diaphragms supported by drilled piles.
SHP: design for construction permission
bid design
detailed design