Bridge across the Ostravice River, Motorway D48,
Frýdek-Místek, Bypass

Under construction

The twin bridge of the total length of 252.00 m is formed by a continuous girder of six spans of a span length from 30.00 to 54.00 m. The deck of each bridge is assembled from four steel plate girders of depth of 1.90 m and a composite deck slab from reinforced concrete. The steel girders are via steel diaphragms indirectly supported by couples of slender concrete piers.

SHP: tender design
          detailed design