Under construction
The twin bridge of the total length of 220.00 m is formed by a continuous girder of five spans of a span length from 35.00 to 50.00 m. The deck of each bridge is assembled from four steel plate girders of depth of 1.70 m and a composite slab from reinforced concrete. The steel girders are via steel diaphragms indirectly supported by couples of slender concrete piers.
SHP: tender design
detailed design