<< SHP Group
česky
english
по-русски

<< Back to Steel

Bridge across railway and Opava River, Motorway D47, section 08

Completed in 2006

The twin bridge, with a total length of 730.0 m and spans from 32.9 to 47.2 m, has a deck assembled from steel plate girders and a composite deck slab. The steel deck structure was incrementally assembled beyond the abutment and subsequently launched into the design position.

SHP: design for construction permission
          bid design
          detailed design