<< SHP Group
česky
english
по-русски

<< Back to Steel

Bridge 231, Motorway D48, Rybí - Rychaltice

Under construction

The twin bridge of the total length of 257.30 m is formed by a continuous girder of six spans of a span length from 35.30 to 47.00 m. The deck of each bridge is formed by a double T girder that is assembled of two steel plate girders of depth of 2.80 m and a transversely prestressed composite concrete slab.

SHP: detailed design