<< SHP Group
česky
english
по-русски

<< Back to Precast

Bridge 250, section Svrcinovec - Skalite, Motorway D3, Slovakia

Completed 2017

The bridge of the total length of 255 m is formed by a continuous structure of seven spans of a span length from 24 to 41 m. The deck is formed by precast girders of a constant depth of 2.10 m and a composite cast-in-place deck slab. Since the columns are connected with pier diaphragms by concrete hinges, the bridge forms semi-integral structural system. Only one half of the motorway is constructed now.

SHP: alternative design
          detailed design