Under construction
The twin bridge of the total length of 586 m is formed by a continuous structure of 14 spans of a span length from 33 to 44 m. The deck is formed by precast girders of a constant depth of 2.10 m and a composite cast-in-place deck slab.
SHP: alternative design
detailed design