Under construction
The twin bridge of the total length of 947 m is divided into three bridge sections of lengths of 273.5 + 400.0 + 273.5 m. The piers are formed by twin columns that are mutually connected by longitudinal walls situated at their bottom parts. Since the columns are hinge connected with the piers’ caps and bearings are situated only at the end abutments, the bridge forms a semi-integral structural system.
SHP: alternative designh
detailed design