<< SHP Group
česky
english
по-русски

<< Back to Cast-in-place

Bridge Zizelice, Motorway D11

Completed in 2006

The twin bridge, with a total length of 524 m and spans from 25.00 to 40.00 m, is formed by a continuous girder with a double-tee cross section that was progressively cast – span by span – in a formwork suspended overhead on movable scaffolding. The girders are indirectly supported by pier diaphragms.

SHP: alternative design
          detailed design