<< SHP Group
česky
english
по-русски

<< Back to Cast-in-place

Bridge Kninice, Motorway D8

Completed in 2006

The twin bridge, with a total length of 1,008 m and spans from 31.50 to 42.00 m, is formed by a spine girder of variable depth that was progressively cast – span by span – in a formwork supported by underslung movable scaffolding.

SHP: design for construction permission
          bid design
          detailed design