Bridge across the railway and Odra River, Motorway D47, section 05

Completed in 2009

The twin bridge, with a total length of 860 m and spans from 25.00 to 50.00 m, is formed by a continuous girder with a double-tee cross section that is being progressively cast – span by span – in a formwork suspended overhead on movable scaffolding. The girders are indirectly supported by pier diaphragms. There are tapered bottom slabs on both sides of the piers that support 50 m long spans.

SHP: alternative design
          detailed design