<< SHP Group
česky
english
по-русски

<< Back to Cast-in-place

Bridge across the railway and Husi Creek, Motorway D47, section 05

Completed in 2009

The twin bridge, with a total length of 857 m and spans from 33 to 41 m, is formed by a continuous girder of variable depth. The deck, with a double-tee cross section, is being progressively cast – span by span – in a formwork supported by movable scaffolding.

SHP: alternative design
          detailed design