<< SHP Group
česky
english
по-русски

<< Back to Cast-in-place

Bridge across the Malkovsky Creek Valley, Motorway D1, Slovakia

Under construction

The twin bridge of the total length of 431 and 486 m is formed by a continuous girder of seven and eight spans of lengths from 42 to 70 m. The deck of each bridge is formed by a single cell box girder of constant depth of 3.50 m which was progressively cast in symmetrical cantilevers starting at piers.

SHP: construction engineering