Bridge across the Lutina Creek Valley, Motorway D47, section 04

Completed in 2009

The twin bridge, with a total length of 317 m and spans from 25.00 to 32.00 m, is formed by a continuous girder with a double-tee cross section that is being progressively cast – span by span – in a formwork supported by movable scaffolding.

SHP: design for construction permission
          bid design
          detailed design