<< SHP Group
česky
english
по-русски

<< Back to Cast-in-place

Bridge 210, section Hubova - Ivachnova, Motorway D1, Slovakia

Under construction

The twin bridge of the total length of 394 m is formed by a continuous girder of 10 spans of a span length from 32.00 to 41.00 m. The deck of each bridge is formed by a box girder of a constant depth of 2.40 m. The girder is incrementally cast span-by-span in a formwork supported by movable scaffolding. Both bridges are monolithically connected with ramps.

SHP: alternative design
          detailed design