Completed in 2010
The twin bridge, with of a total length of 241 m and spans from 35.50 to 42.00 m, is formed by a continuous girder of a double-tee cross section that is being progressively cast – span by span – in a framework suspended on a overhead movable scaffolding.
SHP: alternative design
detailed design
in a joint venture with Alfa 04, Bratislava