Completed in 2012
The junction Kostivarska required the construction of five bridges with lengths from 12 to 252 m. The span lengths are from 12.00 to 37.63 m. Major bridges are formed by a spine girder with large overhangs.
SHP: alternative design
design for construction permission
final design