<< SHP Group
česky
english
по-русски

<< Back to Urban bridges

Junction Kostivarska, Banska Bystrica, PPP project, R1, Slovakia

Completed in 2012

The junction Kostivarska required the construction of five bridges with lengths from 12 to 252 m. The span lengths are from 12.00 to 37.63 m. Major bridges are formed by a spine girder with large overhangs.

SHP: alternative design
          design for construction permission
          final design